Bay Bridge Info Video Podcast
Summary: Behind the scenes tours and information about the seismic retrofit of the San Francisco-Oakland Bay Bridge
- Visit Website
- RSS
- Artist: Bay Bridge Public Information Office
- Copyright: ℗ & © 2010
Podcasts:
Video footage of the placement of the SAS Tower Fourth Stage Lift
Video footage of the placement of the SAS Tower Second Stage Lift
The machinery that lifts the SAS tower Sections into place.
Bart Ney talks about the architecture of the SAS tower.
SAS Tower: Four Legs, Five Lifts
Overview of Bay Bridge Self-Anchored Suspension Span highlighting components manufactured around the world.
Learn how we're building the Oakland Touchdown, the eastern end of the new East Span
The West Approach Project Defined
Overview of the Oakland Touchdown
An update on the lowering and demolition of the structure which was rolled out during Labor Day 2009.
Simulation showing how the new East Span is designed to react to a 1 in 1,500 year seismic event
Bart Ney discusses traffic flow changes on the Yerba Buena Island Detour, progress of the old deck demolition and how the section of the old bridge is going to be lowered, disassembled and recycled.
Bay Bridge Reopens. Thanks, Bay Area!
Press Conference: Bridge reopening delayed.
Public Information Officer Bart Ney on the big picture